Guides
Bogotá Metro Guides
Verified answers to the most common questions about Line 1, with a source for every fact. Where EMB hasn't announced something yet, we say so plainly instead of guessing.
When does it open?
Test run expected September 2027, commercial opening expected March 2028, per EMB — and why these dates are forecasts, not promises.
Fares
No separate metro fare — it plugs into the SITP fare system via the TuLlave card. The current SITP fare, for reference.
Schedule
EMB hasn't announced hours or frequency yet. Here's what's actually known about the trains — and why that isn't a timetable.
How it works
Driverless trains, CBTC signaling, standard-gauge track, and full accessibility: the technical specs behind Line 1.
Line 1 Travel Time Calculator
Pick a departure and arrival station to estimate how long a trip would take on Bogotá Metro Line 1. The system isn't running commercially yet — commercial opening is expected in March 2028 — so this is a planning estimate, not a real timetable.