Blog
Bogotá Metro Blog
Stories and updates about Bogotá Metro Line 1, always grounded in verifiable official sources — same as the rest of this site.
TransMilenioTourismHow to Get to Corferias by TransMilenio (Bogotá)
Corferias station is on Calle 26. What's officially confirmed, what isn't published (route codes), nearby zonal stops, TuLlave, and how to find today's route.
Published October 11, 2026 · 4 min read
TransMilenioTuLlave Card: How to Buy, Recharge and Use It for the Metro
Where to buy Bogotá's TuLlave transit card as a visitor, including at El Dorado airport, how to load it, and official word it will work for the Metro.
Published August 25, 2026 · 5 min read
ExpansionHistoryRegioTram de Occidente: Link to the Bogotá Metro
The RegioTram de Occidente will link Facatativá, Madrid, Mosquera and Funza with Bogotá, ending at Metro Line 1's Central station. What's confirmed today.
Published July 23, 2026 · 6 min read
ExpansionAirportWill Bogotá Have a Metro Line 3? What's Confirmed
Bogotá Metro Line 3 is still in prefeasibility studies: no design, route or opening date. Here's what's confirmed, including its proposed airport link.
Published July 20, 2026 · 4 min read
Construction progressHistoryDoes Bogotá Have a Metro? What Exists Right Now
No, Bogotá doesn't have a metro running yet, but construction is past 80% complete. Here's what exists today, what's left, and when it's expected to open.
Published July 17, 2026 · 2 min read
HistoryTransMilenioTransMilenio: What It Is and How It Connects to the Metro
TransMilenio wasn't built instead of a metro; it was built because the metro couldn't be funded in the 1990s. What it is and how it links to Line 1.
Published July 16, 2026 · 3 min read
TourismAirportDoes the Bogotá Metro Reach El Dorado Airport? Not Line 1
No: Bogotá Metro Line 1 does not reach El Dorado Airport; it ends at Avenida Caracas and Calle 72. How to get to the airport today and what's been proposed.
Published July 13, 2026 · 3 min read
Construction progressMilestonesHow Bogotá Metro Line 1 Construction Reached 80% Complete
A narrative recap of how Bogotá Metro Line 1 construction progressed from 28.98% to over 80% between 2024 and 2026, with a source for every fact in the text.
Published July 13, 2026 · 3 min read
HistoryConstruction progressWhy Did It Take Bogotá More Than 80 Years to Build a Metro?
Bogotá is one of South America's largest cities, and for decades it had no metro. The history of the stalled attempts, from 1942 to today's construction.
Published July 13, 2026 · 3 min read